Triple
T19478218
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | New York City Subway tracks (upper level, formerly) |
E487308
|
entity |
| Predicate | carriedOver |
P136075
|
FINISHED |
| Object | Queensboro Bridge upper deck |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Queensboro Bridge upper deck | Statement: [New York City Subway tracks (upper level, formerly), carriedOver, Queensboro Bridge upper deck]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Queensboro Bridge upper deck Context triple: [New York City Subway tracks (upper level, formerly), carriedOver, Queensboro Bridge upper deck]
-
A.
Queensboro Bridge (Queens side)
Queensboro Bridge (Queens side) refers to the portion of the historic cantilever bridge where it connects to and enters the borough of Queens in New York City.
-
B.
Manhattan Bridge
The Manhattan Bridge is a suspension bridge in New York City that connects Lower Manhattan and Downtown Brooklyn and carries both vehicular traffic and subway lines.
-
C.
Walkway Over the Hudson
Walkway Over the Hudson is a former railroad bridge transformed into one of the world’s longest elevated pedestrian parks, offering expansive views over the Hudson River in New York.
-
D.
Brooklyn Bridge–City Hall
Brooklyn Bridge–City Hall is a major New York City Subway station complex in Lower Manhattan serving as a key transit hub near the Brooklyn Bridge and City Hall.
-
E.
Queensboro Bridge
chosen
The Queensboro Bridge is a major cantilever bridge in New York City that connects the boroughs of Manhattan and Queens and is a key artery for vehicular, bicycle, and pedestrian traffic.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: carriedOver Context triple: [New York City Subway tracks (upper level, formerly), carriedOver, Queensboro Bridge upper deck]
-
A.
carriedFrom
Indicates that something was transported or moved away starting from a specified source location or origin.
-
B.
carriedTo
Indicates that one entity transported or conveyed another entity from one place to another.
-
C.
carriedSince
Indicates that one entity has been continuously carrying or transporting another entity starting from a specified point in time.
-
D.
heldOver
Indicates that something has been continued, carried forward, or extended in effect or duration beyond its original or expected time.
-
E.
stateCarried
Indicates that a particular state or condition is being actively maintained or borne by an entity or process.
- F. None of above. chosen
Provenance (4 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8e8d924388190b847cb15bb3d0aff |
completed | April 10, 2026, 12:11 p.m. |
| NER | Named-entity recognition | batch_69e63437b9748190a8fc6bf6b3d90918 |
completed | April 20, 2026, 2:12 p.m. |
| PD | Predicate disambiguation | batch_69e4fd7883308190b73912a71a35a835 |
completed | April 19, 2026, 4:06 p.m. |
| PDg | Predicate description generation | batch_69e5004d3a708190a1c13c8f644f3926 |
completed | April 19, 2026, 4:18 p.m. |
Created at: April 10, 2026, 1:39 p.m.