Triple

T19474295
Position Surface form Disambiguated ID Type / Status
Subject Caribbean Institute for Meteorology and Hydrology E487204 entity
Predicate instanceOf P0 FINISHED
Object operational center C1321 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: operational center
Context triple: [Caribbean Institute for Meteorology and Hydrology, instanceOf, operational center]
  • A. military operations center
    A military operations center is a centralized facility where commanders and staff monitor, coordinate, and direct military activities and resources in real time.
  • B. police operations center
    A police operations center is a centralized facility where law enforcement personnel monitor incidents, coordinate field units, manage communications, and make real-time decisions to ensure public safety and effective response.
  • C. command and control centre
    A command and control centre is a centralized facility where information is collected, analyzed, and used to coordinate and direct operations, resources, and decision-making in real time.
  • D. centralized monitoring center chosen
    A centralized monitoring center is a dedicated facility that aggregates, analyzes, and manages real-time data and alerts from distributed systems or locations to enable coordinated oversight and rapid response.
  • E. operational unit
    An operational unit is an organized group, department, or component within a larger system that performs specific tasks or functions to achieve defined operational objectives.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e8d924388190b847cb15bb3d0aff completed April 10, 2026, 12:11 p.m.
Created at: April 10, 2026, 1:39 p.m.