Triple
T19473048
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Hilti Corporation |
E487172
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | construction technology company |
C42061
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: construction technology company Context triple: [Hilti Corporation, instanceOf, construction technology company]
-
A.
construction management firm
A construction management firm is a professional organization that plans, coordinates, and oversees construction projects from inception to completion, ensuring they are delivered on time, within budget, and to specified quality and safety standards.
-
B.
construction pioneer
A construction pioneer is an innovative leader who introduces groundbreaking methods, materials, or technologies that significantly advance how the built environment is designed and constructed.
-
C.
construction and trading company
A construction and trading company is a business entity that both executes building and infrastructure projects and engages in the procurement, sale, and distribution of construction-related materials, equipment, or goods.
-
D.
engineering firm
An engineering firm is a business organization that provides professional engineering services—such as design, analysis, consulting, and project management—to plan, develop, and implement technical solutions for clients in various industries.
-
E.
bridge construction company
A bridge construction company is a specialized engineering and construction firm that plans, designs, and builds bridges, managing all phases from feasibility studies and structural design to on-site construction and maintenance.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8e8d924388190b847cb15bb3d0aff |
completed | April 10, 2026, 12:11 p.m. |
Created at: April 10, 2026, 1:39 p.m.