Triple

T19472950
Position Surface form Disambiguated ID Type / Status
Subject Schaan-Vaduz railway station E487169 entity
Predicate hasAddress P4379 FINISHED
Object Bahnhofstrasse, Schaan, Liechtenstein NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Bahnhofstrasse, Schaan, Liechtenstein | Statement: [Schaan-Vaduz railway station, hasAddress, Bahnhofstrasse, Schaan, Liechtenstein]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Bahnhofstrasse, Schaan, Liechtenstein
Context triple: [Schaan-Vaduz railway station, hasAddress, Bahnhofstrasse, Schaan, Liechtenstein]
  • A. Schaan-Vaduz railway station
    Schaan-Vaduz railway station is the main international rail stop in Liechtenstein, serving both the municipality of Schaan and the nearby capital Vaduz on the line between Switzerland and Austria.
  • B. Schaffhauserstrasse
    Schaffhauserstrasse is a major street in Zurich, Switzerland, that connects the city center with northern districts and serves as an important urban transport corridor.
  • C. Bahnhofstrasse
    Bahnhofstrasse is Zürich’s famous luxury shopping street, known for its high-end boutiques, banks, and central location in the city.
  • D. Davos Platz
    Davos Platz is the central district of the Swiss Alpine town of Davos, known for hosting major international events and serving as a key hub for tourism and winter sports.
  • E. Lötschentalstrasse
    Lötschentalstrasse is the main access road running through Switzerland’s Lötschental valley, connecting it and the Goppenstein area to the wider regional road network.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Bahnhofstrasse, Schaan, Liechtenstein
Target entity description: Bahnhofstrasse, Schaan, Liechtenstein is a central street in the municipality of Schaan that serves as a key access route to the Schaan-Vaduz railway station.
  • A. Schaan-Vaduz railway station
    Schaan-Vaduz railway station is the main international rail stop in Liechtenstein, serving both the municipality of Schaan and the nearby capital Vaduz on the line between Switzerland and Austria.
  • B. Schaffhauserstrasse
    Schaffhauserstrasse is a major street in Zurich, Switzerland, that connects the city center with northern districts and serves as an important urban transport corridor.
  • C. Bahnhofstrasse
    Bahnhofstrasse is Zürich’s famous luxury shopping street, known for its high-end boutiques, banks, and central location in the city.
  • D. Davos Platz
    Davos Platz is the central district of the Swiss Alpine town of Davos, known for hosting major international events and serving as a key hub for tourism and winter sports.
  • E. Lötschentalstrasse
    Lötschentalstrasse is the main access road running through Switzerland’s Lötschental valley, connecting it and the Goppenstein area to the wider regional road network.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e8d924388190b847cb15bb3d0aff completed April 10, 2026, 12:11 p.m.
NER Named-entity recognition batch_69e633ea604c8190a2feacb709b7ca27 completed April 20, 2026, 2:10 p.m.
Created at: April 10, 2026, 1:39 p.m.