Triple

T19472703
Position Surface form Disambiguated ID Type / Status
Subject Appalachian Highway corridor in Ohio E487164 entity
Predicate routeNumber P1864 FINISHED
Object SR 823 NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: SR 823 | Statement: [Appalachian Highway corridor in Ohio, routeNumber, SR 823]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: SR 823
Context triple: [Appalachian Highway corridor in Ohio, routeNumber, SR 823]
  • A. SR 823 chosen
    SR 823 is a short state highway in Washington that serves as a connector route near the city of Selah in Yakima County.
  • B. SR 826
    SR 826 is a major state highway in Miami-Dade County, Florida, commonly known as the Palmetto Expressway, that serves as a key north–south and east–west transportation corridor.
  • C. SR 82
    SR 82 is a state highway designation used for specific numbered routes within a U.S. state's road network.
  • D. SR 8
    SR 8 is a major north–south state highway in Ohio that connects the Akron area with Cleveland’s southeastern suburbs and other communities in northeastern Ohio.
  • E. SR 8
    SR 8 is a state highway in Washington that connects U.S. Route 101 near Elma to U.S. Route 12 near Olympia, serving as a key east–west corridor in the region.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e8d924388190b847cb15bb3d0aff completed April 10, 2026, 12:11 p.m.
NER Named-entity recognition batch_69e633ea604c8190a2feacb709b7ca27 completed April 20, 2026, 2:10 p.m.
Created at: April 10, 2026, 1:39 p.m.