Triple

T19472697
Position Surface form Disambiguated ID Type / Status
Subject Appalachian Highway corridor in Ohio E487164 entity
Predicate hasPart P35 FINISHED
Object Ohio State Route 823 NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Ohio State Route 823 | Statement: [Appalachian Highway corridor in Ohio, hasPart, Ohio State Route 823]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Ohio State Route 823
Context triple: [Appalachian Highway corridor in Ohio, hasPart, Ohio State Route 823]
  • A. Ohio State Route 82
    Ohio State Route 82 is an east–west state highway in northeastern Ohio that serves as a major commuter and commercial corridor connecting multiple suburbs and communities in the Greater Cleveland area.
  • B. Ohio State Route 83
    Ohio State Route 83 is a north–south state highway in Ohio that runs through several counties, connecting communities such as Wooster with other parts of the state.
  • C. Ohio State Route 88
    Ohio State Route 88 is a state highway in northeastern Ohio that serves as a regional connector through Portage County and surrounding rural communities.
  • D. Ohio State Route 81
    Ohio State Route 81 is an east–west state highway in western Ohio that connects several small communities and rural areas, including the village of Ada.
  • E. Ohio State Route 237
    Ohio State Route 237 is a primary north–south highway in northeastern Ohio that connects suburbs like Middleburg Heights to Cleveland Hopkins International Airport and the Cleveland area freeway network.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Ohio State Route 823
Target entity description: Ohio State Route 823 is a modern four-lane bypass in southern Ohio designed to improve traffic flow and safety along the Appalachian Highway corridor.
  • A. Ohio State Route 82
    Ohio State Route 82 is an east–west state highway in northeastern Ohio that serves as a major commuter and commercial corridor connecting multiple suburbs and communities in the Greater Cleveland area.
  • B. Ohio State Route 83
    Ohio State Route 83 is a north–south state highway in Ohio that runs through several counties, connecting communities such as Wooster with other parts of the state.
  • C. Ohio State Route 88
    Ohio State Route 88 is a state highway in northeastern Ohio that serves as a regional connector through Portage County and surrounding rural communities.
  • D. Ohio State Route 81
    Ohio State Route 81 is an east–west state highway in western Ohio that connects several small communities and rural areas, including the village of Ada.
  • E. Ohio State Route 237
    Ohio State Route 237 is a primary north–south highway in northeastern Ohio that connects suburbs like Middleburg Heights to Cleveland Hopkins International Airport and the Cleveland area freeway network.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e8d924388190b847cb15bb3d0aff completed April 10, 2026, 12:11 p.m.
NER Named-entity recognition batch_69e633ea604c8190a2feacb709b7ca27 completed April 20, 2026, 2:10 p.m.
Created at: April 10, 2026, 1:39 p.m.