Triple

T19472696
Position Surface form Disambiguated ID Type / Status
Subject Appalachian Highway corridor in Ohio E487164 entity
Predicate hasPart P35 FINISHED
Object Ohio State Route 124 NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Ohio State Route 124 | Statement: [Appalachian Highway corridor in Ohio, hasPart, Ohio State Route 124]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Ohio State Route 124
Context triple: [Appalachian Highway corridor in Ohio, hasPart, Ohio State Route 124]
  • A. Ohio State Route 129
    Ohio State Route 129 is an east–west state highway in southwestern Ohio that connects Hamilton to the Interstate highway system near Liberty Township and serves as a key commuter and regional connector.
  • B. Ohio State Route 125
    Ohio State Route 125 is an east–west state highway in southern Ohio that runs from Cincinnati toward the Ohio River, serving as a key regional connector through several rural and suburban communities.
  • C. Ohio State Route 122
    Ohio State Route 122 is an east–west state highway in southwestern Ohio that connects the city of Middletown to rural areas and other regional routes.
  • D. Ohio State Route 126
    Ohio State Route 126 is an east–west state highway in southwestern Ohio that serves as a key connector through the Cincinnati metropolitan area, including the city of Blue Ash.
  • E. Ohio State Route 412
    Ohio State Route 412 is a short east–west state highway in northern Ohio that serves as a local connector route in and around the city of Fremont.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Ohio State Route 124
Target entity description: Ohio State Route 124 is a state highway in southern Ohio that runs through several Appalachian counties, serving as part of a key east–west transportation corridor in the region.
  • A. Ohio State Route 129
    Ohio State Route 129 is an east–west state highway in southwestern Ohio that connects Hamilton to the Interstate highway system near Liberty Township and serves as a key commuter and regional connector.
  • B. Ohio State Route 125
    Ohio State Route 125 is an east–west state highway in southern Ohio that runs from Cincinnati toward the Ohio River, serving as a key regional connector through several rural and suburban communities.
  • C. Ohio State Route 122
    Ohio State Route 122 is an east–west state highway in southwestern Ohio that connects the city of Middletown to rural areas and other regional routes.
  • D. Ohio State Route 126
    Ohio State Route 126 is an east–west state highway in southwestern Ohio that serves as a key connector through the Cincinnati metropolitan area, including the city of Blue Ash.
  • E. Ohio State Route 412
    Ohio State Route 412 is a short east–west state highway in northern Ohio that serves as a local connector route in and around the city of Fremont.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e8d924388190b847cb15bb3d0aff completed April 10, 2026, 12:11 p.m.
NER Named-entity recognition batch_69e633ea604c8190a2feacb709b7ca27 completed April 20, 2026, 2:10 p.m.
Created at: April 10, 2026, 1:39 p.m.