Triple
T19467366
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | United States Navy shipyards |
E487034
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | naval industrial facility network |
C18743
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: naval industrial facility network Context triple: [United States Navy shipyards, instanceOf, naval industrial facility network]
-
A.
naval anchorage network
A naval anchorage network is an interconnected system of designated maritime anchor points, supporting infrastructure, and communication links that enables coordinated deployment, resupply, and protection of naval vessels across strategic sea areas.
-
B.
naval arsenal
A naval arsenal is a specialized military facility where warships are built, repaired, equipped, and supplied with weapons, ammunition, and other naval stores.
-
C.
naval shore establishment
chosen
A naval shore establishment is a land-based facility that supports a navy’s operations, administration, training, logistics, and maintenance away from seagoing vessels.
-
D.
naval defense system
A naval defense system is an integrated network of sensors, weapons, platforms, and command-and-control components designed to detect, deter, and neutralize maritime threats to ships, fleets, and coastal assets.
-
E.
naval victualling yard
A naval victualling yard is a specialized dockyard facility where food, drink, and other provisions are stored, processed, and supplied to naval ships and personnel.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8e8d86d608190bd199a98d0297f27 |
completed | April 10, 2026, 12:11 p.m. |
Created at: April 10, 2026, 1:39 p.m.