Triple

T19459960
Position Surface form Disambiguated ID Type / Status
Subject Poughkeepsie Bridge Company E486840 entity
Predicate instanceOf P0 FINISHED
Object bridge company C8088 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: bridge company
Context triple: [Poughkeepsie Bridge Company, instanceOf, bridge company]
  • A. bridge operator
    A bridge operator is an entity responsible for managing and controlling the operation, safety, and coordination of a bridge’s movable or functional components to ensure efficient and secure passage for users.
  • B. bridge approach
    A bridge approach is the section of roadway that transitions between the ground and the main span of a bridge, providing a smooth and stable connection for vehicles and pedestrians.
  • C. bridge construction company chosen
    A bridge construction company is a specialized engineering and construction firm that plans, designs, and builds bridges, managing all phases from feasibility studies and structural design to on-site construction and maintenance.
  • D. private bridge
    A private bridge is a non-publicly owned structure that spans a physical obstacle, such as a river or road, to provide controlled access exclusively for specific individuals, properties, or organizations.
  • E. bridge writer
    A bridge writer is a specialized author who crafts transitional content that seamlessly connects disparate ideas, sections, or works to create a coherent and continuous narrative or conceptual flow.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e8d86d608190bd199a98d0297f27 completed April 10, 2026, 12:11 p.m.
Created at: April 10, 2026, 1:38 p.m.