Triple

T19456976
Position Surface form Disambiguated ID Type / Status
Subject Wandoor Jetty E486759 entity
Predicate instanceOf P0 FINISHED
Object coastal embarkation point C12386 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: coastal embarkation point
Context triple: [Wandoor Jetty, instanceOf, coastal embarkation point]
  • A. maritime staging area
    A maritime staging area is a designated coastal or offshore zone where ships assemble, organize, and prepare personnel, equipment, and supplies for subsequent maritime operations or movements.
  • B. shore establishment
    A shore establishment is a land-based facility that supports naval or maritime operations through administration, logistics, training, maintenance, or other essential services.
  • C. coastal harbour
    A coastal harbour is a sheltered area along a shoreline where the sea meets the land, providing safe anchorage and facilities for ships and boats to dock, load, and unload.
  • D. port area chosen
    A port area is a designated coastal or riverside zone equipped with infrastructure and facilities for the berthing, loading, unloading, storage, and transfer of cargo and passengers between land and water transport.
  • E. seaplane base
    A seaplane base is a designated water aerodrome, often with minimal shore facilities, where seaplanes and amphibious aircraft can take off, land, dock, and receive basic services.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e8d86d608190bd199a98d0297f27 completed April 10, 2026, 12:11 p.m.
Created at: April 10, 2026, 1:38 p.m.