Triple
T19446975
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Moose Creek Dam |
E486503
|
entity |
| Predicate | partOf |
P40
|
FINISHED |
| Object | Chena River Lakes Flood Control Project |
—
|
NE NERFINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Chena River Lakes Flood Control Project | Statement: [Moose Creek Dam, partOf, Chena River Lakes Flood Control Project]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Chena River Lakes Flood Control Project Context triple: [Moose Creek Dam, partOf, Chena River Lakes Flood Control Project]
-
A.
Chena River Lakes Flood Control Project
chosen
The Chena River Lakes Flood Control Project is a U.S. Army Corps of Engineers system of dams, levees, and related structures near Fairbanks, Alaska, designed to reduce flooding along the Chena River and protect surrounding communities.
-
B.
Shoshone Project
The Shoshone Project is a U.S. Bureau of Reclamation irrigation and water management development in Wyoming that harnesses the Shoshone River through dams, reservoirs, and canals to support agriculture and regional growth.
-
C.
Assiniboine River flood control system
The Assiniboine River flood control system is an integrated network of dams, reservoirs, and related infrastructure designed to manage water levels and reduce flooding along the Assiniboine River in Canada.
-
D.
Howard A. Hanson Dam project
The Howard A. Hanson Dam project is a major flood-control and water management infrastructure initiative on Washington’s Green River that protects downstream communities in the Puget Sound region.
-
E.
Colorado-Big Thompson Project
The Colorado-Big Thompson Project is a major transbasin water diversion and storage system in Colorado that delivers Colorado River water to the arid eastern plains for agriculture, cities, and industry.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8e8d7ad488190a3373045029b0f3b |
completed | April 10, 2026, 12:11 p.m. |
| NER | Named-entity recognition | batch_69e6338b25d88190bc137a411576c73f |
completed | April 20, 2026, 2:09 p.m. |
Created at: April 10, 2026, 1:38 p.m.