Triple

T19446580
Position Surface form Disambiguated ID Type / Status
Subject Burbank Airport–South station E486492 entity
Predicate near P350 FINISHED
Object Interstate 5 NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Interstate 5 | Statement: [Burbank Airport–South station, near, Interstate 5]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Interstate 5
Context triple: [Burbank Airport–South station, near, Interstate 5]
  • A. Interstate 5 chosen
    Interstate 5 is a major north–south U.S. highway running along the West Coast from the Mexican border in California through Oregon and Washington to the Canadian border.
  • B. Highway 101
    Highway 101 is a major highway in Nova Scotia, Canada, that serves as a key transportation corridor through the Annapolis Valley and connects several communities in the region.
  • C. Highway 101
    Highway 101 is a major north–south U.S. route running along the West Coast, serving as a key corridor through California’s Wine Country and other coastal regions.
  • D. Highway 101
    Highway 101 is a major Ontario provincial highway in Canada that runs east–west across Northern Ontario, connecting several remote communities and resource-based regions.
  • E. Highway 101
    Highway 101 is a major coastal route in British Columbia’s Sunshine Coast region, connecting communities such as Sechelt along the shoreline.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e8d7ad488190a3373045029b0f3b completed April 10, 2026, 12:11 p.m.
NER Named-entity recognition batch_69e6338a22608190bb31a1690ca0dab6 completed April 20, 2026, 2:09 p.m.
Created at: April 10, 2026, 1:38 p.m.