Triple

T19445069
Position Surface form Disambiguated ID Type / Status
Subject Gaffney, South Carolina E486452 entity
Predicate hasLandmark P105 FINISHED
Object Peachoid water tower on Interstate 85 NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Peachoid water tower on Interstate 85 | Statement: [Gaffney, South Carolina, hasLandmark, Peachoid water tower on Interstate 85]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Peachoid water tower on Interstate 85
Context triple: [Gaffney, South Carolina, hasLandmark, Peachoid water tower on Interstate 85]
  • A. Interstate 85 in Georgia
    Interstate 85 in Georgia is a major north–south Interstate Highway that runs through key cities including Atlanta, serving as a primary transportation corridor in the state and the southeastern United States.
  • B. Riverside water tower
    The Riverside water tower is a historic landmark structure that once served as a municipal water supply facility within the Riverside Historic District.
  • C. Interstate 285 in Georgia
    Interstate 285 in Georgia is the beltway encircling Atlanta, serving as a major bypass and connector for multiple interstate highways around the city.
  • D. Interstate 75 in Calhoun, Georgia
    Interstate 75 in Calhoun, Georgia is a major north–south freeway segment of I-75 that serves as a key transportation corridor for local and regional traffic in northwest Georgia.
  • E. Jumbo Water Tower
    Jumbo Water Tower is a prominent Victorian-era water tower and local landmark in Colchester, England, known for its massive brick structure and distinctive nickname.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Peachoid water tower on Interstate 85
Target entity description: The Peachoid water tower on Interstate 85 is a famously peach-shaped water tower and roadside landmark in Gaffney, South Carolina, known for its distinctive, giant fruit-like appearance.
  • A. Interstate 85 in Georgia
    Interstate 85 in Georgia is a major north–south Interstate Highway that runs through key cities including Atlanta, serving as a primary transportation corridor in the state and the southeastern United States.
  • B. Riverside water tower
    The Riverside water tower is a historic landmark structure that once served as a municipal water supply facility within the Riverside Historic District.
  • C. Interstate 285 in Georgia
    Interstate 285 in Georgia is the beltway encircling Atlanta, serving as a major bypass and connector for multiple interstate highways around the city.
  • D. Interstate 75 in Calhoun, Georgia
    Interstate 75 in Calhoun, Georgia is a major north–south freeway segment of I-75 that serves as a key transportation corridor for local and regional traffic in northwest Georgia.
  • E. Jumbo Water Tower
    Jumbo Water Tower is a prominent Victorian-era water tower and local landmark in Colchester, England, known for its massive brick structure and distinctive nickname.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e8d7ad488190a3373045029b0f3b completed April 10, 2026, 12:11 p.m.
NER Named-entity recognition batch_69e6338921cc819083f8f918225d78e6 completed April 20, 2026, 2:09 p.m.
Created at: April 10, 2026, 1:38 p.m.