Triple

T19445055
Position Surface form Disambiguated ID Type / Status
Subject Gaffney, South Carolina E486452 entity
Predicate hasMajorHighway P385 FINISHED
Object South Carolina Highway 11 NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: South Carolina Highway 11 | Statement: [Gaffney, South Carolina, hasMajorHighway, South Carolina Highway 11]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: South Carolina Highway 11
Context triple: [Gaffney, South Carolina, hasMajorHighway, South Carolina Highway 11]
  • A. South Carolina Highway 14
    South Carolina Highway 14 is a primary state highway in South Carolina that connects several upstate communities and serves as a regional route between rural areas and larger cities.
  • B. South Carolina Highway 113
    South Carolina Highway 113 is a primary state highway in South Carolina that serves as a regional connector route in and around the town of Wagener.
  • C. South Carolina Highway 151
    South Carolina Highway 151 is a primary state highway in South Carolina that serves as a key regional route connecting several communities in the northeastern part of the state.
  • D. South Carolina Highway 102
    South Carolina Highway 102 is a primary state highway in South Carolina that connects several communities in the northeastern part of the state, including the Hartsville area.
  • E. South Carolina Highway 160
    South Carolina Highway 160 is a primary state highway in northern South Carolina that connects the town of Fort Mill to the North Carolina state line and the greater Charlotte metropolitan area.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: South Carolina Highway 11
Target entity description: South Carolina Highway 11, also known as the Cherokee Foothills Scenic Highway, is a picturesque state route that runs along the Blue Ridge Mountains in northern South Carolina, connecting small towns and natural attractions.
  • A. South Carolina Highway 14
    South Carolina Highway 14 is a primary state highway in South Carolina that connects several upstate communities and serves as a regional route between rural areas and larger cities.
  • B. South Carolina Highway 113
    South Carolina Highway 113 is a primary state highway in South Carolina that serves as a regional connector route in and around the town of Wagener.
  • C. South Carolina Highway 151
    South Carolina Highway 151 is a primary state highway in South Carolina that serves as a key regional route connecting several communities in the northeastern part of the state.
  • D. South Carolina Highway 102
    South Carolina Highway 102 is a primary state highway in South Carolina that connects several communities in the northeastern part of the state, including the Hartsville area.
  • E. South Carolina Highway 160
    South Carolina Highway 160 is a primary state highway in northern South Carolina that connects the town of Fort Mill to the North Carolina state line and the greater Charlotte metropolitan area.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e8d7ad488190a3373045029b0f3b completed April 10, 2026, 12:11 p.m.
NER Named-entity recognition batch_69e6338921cc819083f8f918225d78e6 completed April 20, 2026, 2:09 p.m.
Created at: April 10, 2026, 1:38 p.m.