Triple

T19442586
Position Surface form Disambiguated ID Type / Status
Subject Florentino Ameghino E486386 entity
Predicate hasPartNamedAfter P63 FINISHED
Object Florentino Ameghino Dam NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Florentino Ameghino Dam | Statement: [Florentino Ameghino, hasPartNamedAfter, Florentino Ameghino Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Florentino Ameghino Dam
Context triple: [Florentino Ameghino, hasPartNamedAfter, Florentino Ameghino Dam]
  • A. Florentino Ameghino Dam chosen
    Florentino Ameghino Dam is a large hydroelectric and irrigation dam in Argentina’s Chubut Province, built on the Chubut River to control floods and support regional development.
  • B. Pehuenche Dam
    Pehuenche Dam is a hydroelectric dam on the upper Bío Bío River in Chile, forming part of a cascade of power-generating reservoirs in the Andean foothills.
  • C. Rosana Dam
    Rosana Dam is a hydroelectric dam on the Paranapanema River in Brazil, used for generating electricity as part of the broader Paraná River basin power system.
  • D. Arroyito Dam
    Arroyito Dam is a hydroelectric and flood-control dam located on Argentina’s Limay River in the Patagonia region.
  • E. Yacyretá Dam
    The Yacyretá Dam is a large hydroelectric power plant on the border between Argentina and Paraguay that generates electricity by harnessing the flow of the Paraná River.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e8d7ad488190a3373045029b0f3b completed April 10, 2026, 12:11 p.m.
NER Named-entity recognition batch_69e63386c520819092bea5d7f259a226 completed April 20, 2026, 2:09 p.m.
Created at: April 10, 2026, 1:38 p.m.