Triple
T19442181
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Mir-18 |
E486376
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | long-duration spaceflight |
C26752
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: long-duration spaceflight Context triple: [Mir-18, instanceOf, long-duration spaceflight]
-
A.
orbital spaceflight
Orbital spaceflight is the process of launching a spacecraft into a stable, continuous orbit around a celestial body, typically Earth, by achieving sufficient horizontal velocity to balance gravitational pull.
-
B.
crewed spaceflight mission
A crewed spaceflight mission is an organized operation that sends humans into space to perform specific scientific, exploratory, operational, or technological objectives before safely returning them to Earth or another destination.
-
C.
space mission
A space mission is a planned and coordinated endeavor to send spacecraft, instruments, or humans beyond Earth's atmosphere to achieve specific scientific, exploratory, commercial, or technological objectives.
-
D.
International Space Station expedition
chosen
An International Space Station expedition is a long-duration mission during which a designated crew lives and works aboard the ISS to conduct scientific research, perform maintenance, and support ongoing space operations.
-
E.
human spaceflight program
A human spaceflight program is an organized, long-term governmental or commercial initiative that designs, funds, and operates crewed missions beyond Earth’s atmosphere for exploration, research, and related objectives.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8e8d7ad488190a3373045029b0f3b |
completed | April 10, 2026, 12:11 p.m. |
Created at: April 10, 2026, 1:38 p.m.