Triple
T19440798
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Bridge River Country |
E486343
|
entity |
| Predicate | hasInfrastructure |
P2560
|
FINISHED |
| Object | Bridge River hydroelectric system |
—
|
NE NERFINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Bridge River hydroelectric system | Statement: [Bridge River Country, hasInfrastructure, Bridge River hydroelectric system]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Bridge River hydroelectric system Context triple: [Bridge River Country, hasInfrastructure, Bridge River hydroelectric system]
-
A.
Bridge River Power Project
chosen
The Bridge River Power Project is a major hydroelectric development in British Columbia, Canada, consisting of dams, reservoirs, and power stations that harness the Bridge River system to generate electricity.
-
B.
Dead River hydroelectric system
The Dead River hydroelectric system is a network of dams and power stations on Maine’s Dead River that generates hydroelectric power and helps regulate regional water levels.
-
C.
Ord River Hydroelectric Power Station
Ord River Hydroelectric Power Station is a hydroelectric facility in Western Australia that generates renewable electricity from the waters of the Ord River, primarily supplying power to nearby communities and mining operations.
-
D.
Kemano hydroelectric project
The Kemano hydroelectric project is a large-scale power generation facility in British Columbia, Canada, built primarily to supply electricity to the Alcan aluminum smelter in Kitimat by harnessing diverted river flows through extensive tunnels and dams.
-
E.
Ottawa River hydropower system
The Ottawa River hydropower system is an interconnected network of dams and generating stations along the Ottawa River that produces hydroelectric power for surrounding regions in Canada.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8e8d7ad488190a3373045029b0f3b |
completed | April 10, 2026, 12:11 p.m. |
| NER | Named-entity recognition | batch_69e63364371081908e899c2a47af4e5d |
completed | April 20, 2026, 2:08 p.m. |
Created at: April 10, 2026, 1:38 p.m.