Triple

T19438134
Position Surface form Disambiguated ID Type / Status
Subject Six Companies, Inc. E486277 entity
Predicate notableWork P4 FINISHED
Object Boulder Canyon Project NE NERFINISHED

Disambiguation candidates (1 decision)

The exact options the model was shown at each disambiguation step, with the option it chose highlighted — the evidence behind this triple's disambiguated ids.

NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Boulder Canyon Project
Context triple: [Six Companies, Inc., notableWork, Boulder Canyon Project]
  • A. Boulder Canyon Project chosen
    The Boulder Canyon Project was a major U.S. federal public works initiative of the early 20th century that authorized and funded the construction of Hoover Dam and related infrastructure on the Colorado River for flood control, irrigation, and hydroelectric power.
  • B. Shoshone Project
    The Shoshone Project is a U.S. Bureau of Reclamation irrigation and water management development in Wyoming that harnesses the Shoshone River through dams, reservoirs, and canals to support agriculture and regional growth.
  • C. Columbia Basin Project
    The Columbia Basin Project is a large-scale irrigation and hydroelectric development in central Washington State that distributes water and power from the Grand Coulee Dam to support agriculture, industry, and communities across the region.
  • D. Rio Grande Project
    The Rio Grande Project is a major U.S. Bureau of Reclamation irrigation and water management initiative on the Rio Grande that supplies water for agriculture, municipalities, and flood control in southern New Mexico and western Texas.
  • E. Hells Canyon Project
    The Hells Canyon Project is a hydroelectric power complex on the Snake River consisting of multiple dams and reservoirs that generate electricity and provide water management in the Hells Canyon area.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

Stage Batch ID Job type Status
creating batch_69d8e8d7ad488190a3373045029b0f3b elicitation completed
NER batch_69e6336281b88190b1e5ad2606d7c314 ner completed
Created at: April 10, 2026, 1:38 p.m.