Triple
T19433690
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | AppleCare+ |
E486180
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | technical support program |
C27309
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: technical support program Context triple: [AppleCare+, instanceOf, technical support program]
-
A.
professional support program
A professional support program is a structured set of services and resources designed to help individuals develop their skills, navigate workplace challenges, and advance their careers.
-
B.
technical commission
A technical commission is a specialized group of experts formally appointed to study, evaluate, and provide recommendations on complex technical or scientific matters within a specific domain.
-
C.
technical information service
chosen
A technical information service is a specialized support function that collects, manages, and delivers accurate, up-to-date technical data and guidance to users, customers, or internal stakeholders to assist with problem-solving and decision-making.
-
D.
technical emergency service
A technical emergency service is an organized unit that responds to and manages incidents involving technical hazards, infrastructure failures, and specialized rescue operations using expert equipment and skills.
-
E.
logistics support program
A logistics support program is a coordinated set of processes, resources, and tools designed to plan, manage, and sustain the efficient movement, storage, and maintenance of materials and services throughout their lifecycle.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8e8d7ad488190a3373045029b0f3b |
completed | April 10, 2026, 12:11 p.m. |
Created at: April 10, 2026, 1:37 p.m.