Triple

T1942650
Position Surface form Disambiguated ID Type / Status
Subject McCarren Park Pool E41588 entity
Predicate instanceOf P0 FINISHED
Object public swimming pool C345 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: public swimming pool
Context triple: [McCarren Park Pool, instanceOf, public swimming pool]
  • A. swimming facility chosen
    A swimming facility is a dedicated venue equipped with pools and related amenities designed for aquatic recreation, exercise, training, and competitions.
  • B. public aquarium
    A public aquarium is a facility that displays live aquatic animals and plants in tanks and exhibits for education, conservation, and recreation.
  • C. pond
    A pond is a small, often still body of water, natural or artificial, that supports aquatic life and reflects its surrounding environment.
  • D. outdoor fountain
    An outdoor fountain is a decorative water feature installed in exterior spaces that circulates or sprays water for aesthetic, ambient, or architectural enhancement.
  • E. playa
    A playa is a flat-bottomed desert basin that periodically fills with water to form a temporary lake, then dries to leave behind fine sediments and evaporite minerals.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a88649b24c819080047f26b6db2ded completed March 4, 2026, 7:21 p.m.
Created at: March 4, 2026, 7:36 p.m.