Triple

T1940411
Position Surface form Disambiguated ID Type / Status
Subject Maine State Route 27 E41538 entity
Predicate abbreviation P43 FINISHED
Object SR 27
SR 27 is a state highway in Maine that runs north–south, connecting coastal communities with inland towns and recreational areas.
E215981 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: SR 27 | Statement: [Maine State Route 27, abbreviation, SR 27]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: SR 27
Context triple: [Maine State Route 27, abbreviation, SR 27]
  • A. SR 21
    SR 21 is a primary state highway in Alabama that runs north–south across the state, connecting several major towns and highways.
  • B. SR 143
    SR 143 is a short Arizona state highway in the Phoenix metropolitan area that primarily serves as a connector between Interstate 10 and Phoenix Sky Harbor International Airport.
  • C. SR 286
    SR 286 is a major north–south arterial highway in Fairfax County, Virginia, commonly known as the Fairfax County Parkway.
  • D. SR 18
    SR 18 is a state highway in Georgia that runs east–west across the central part of the state, connecting several small towns and regional routes.
  • E. SR 316
    SR 316 is a major east–west state highway in Georgia that connects the Atlanta metropolitan area with the city of Athens.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: SR 27
Triple: [Maine State Route 27, abbreviation, SR 27]
Generated description
SR 27 is a state highway in Maine that runs north–south, connecting coastal communities with inland towns and recreational areas.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: SR 27
Target entity description: SR 27 is a state highway in Maine that runs north–south, connecting coastal communities with inland towns and recreational areas.
  • A. SR 21
    SR 21 is a primary state highway in Alabama that runs north–south across the state, connecting several major towns and highways.
  • B. SR 143
    SR 143 is a short Arizona state highway in the Phoenix metropolitan area that primarily serves as a connector between Interstate 10 and Phoenix Sky Harbor International Airport.
  • C. SR 286
    SR 286 is a major north–south arterial highway in Fairfax County, Virginia, commonly known as the Fairfax County Parkway.
  • D. SR 18
    SR 18 is a state highway in Georgia that runs east–west across the central part of the state, connecting several small towns and regional routes.
  • E. SR 316
    SR 316 is a major east–west state highway in Georgia that connects the Atlanta metropolitan area with the city of Athens.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a88649b24c819080047f26b6db2ded completed March 4, 2026, 7:21 p.m.
NER Named-entity recognition batch_69abb2ca385c8190ad0e4bafbb9b5e5c completed March 7, 2026, 5:08 a.m.
NED1 Entity disambiguation (via context triple) batch_69adf3fa84e48190bac4d96aa3c3ec39 completed March 8, 2026, 10:11 p.m.
NEDg Description generation batch_69adf44290748190b882559de536af09 completed March 8, 2026, 10:12 p.m.
NED2 Entity disambiguation (via description) batch_69adf4d0ac58819096659706ef0785d0 completed March 8, 2026, 10:14 p.m.
Created at: March 4, 2026, 7:36 p.m.