Triple
T19402954
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | TOP500 list |
E485374
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | scientific ranking project |
C34165
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: scientific ranking project Context triple: [TOP500 list, instanceOf, scientific ranking project]
-
A.
coefficient ranking
Coefficient ranking is the ordered evaluation of numerical coefficients based on their magnitude, importance, or influence within a mathematical model or statistical analysis.
-
B.
SS rank
SS rank is a conceptual class representing an elite, top-tier rating or classification that surpasses standard ranking levels, often used to denote exceptional performance or quality.
-
C.
meta-science project
A meta-science project is an initiative that systematically studies and improves scientific practices, methods, and structures to enhance the reliability, efficiency, and impact of research.
-
D.
ranking event
chosen
A ranking event is an occurrence or competition where participants, items, or entities are ordered or graded based on specific criteria or performance outcomes.
-
E.
workplace ranking
Workplace ranking is a system or process that orders employees, teams, or organizations based on performance, productivity, or other predefined criteria to compare and evaluate their relative standing.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8e8d5162481909db12435d9535c1a |
completed | April 10, 2026, 12:11 p.m. |
Created at: April 10, 2026, 1:36 p.m.