Triple

T19398497
Position Surface form Disambiguated ID Type / Status
Subject Tesla Virtual Power Plant solutions E485253 entity
Predicate instanceOf P0 FINISHED
Object virtual power plant system C7916 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: virtual power plant system
Context triple: [Tesla Virtual Power Plant solutions, instanceOf, virtual power plant system]
  • A. wind power plant
    A wind power plant is a facility that converts the kinetic energy of wind into electrical energy using multiple wind turbines and associated infrastructure.
  • B. renewable energy power station
    A renewable energy power station is a facility that generates electricity from naturally replenishing resources such as sunlight, wind, water, or geothermal heat, converting them into usable power for distribution to consumers.
  • C. power system chosen
    A power system is an interconnected network of generation, transmission, distribution, and control components designed to produce and deliver electrical energy reliably and efficiently to end users.
  • D. electric power station
    An electric power station is a facility where various primary energy sources are converted into electrical energy for distribution to homes, businesses, and industries.
  • E. home battery system
    A home battery system is a residential energy storage solution that stores electricity—often from solar panels or the grid—for later use to increase energy independence, reliability, and cost savings.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e8d5162481909db12435d9535c1a completed April 10, 2026, 12:11 p.m.
Created at: April 10, 2026, 1:36 p.m.