Triple

T19391545
Position Surface form Disambiguated ID Type / Status
Subject Lai Châu province E485079 entity
Predicate contains P35 FINISHED
Object Lai Châu hydropower plant NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Lai Châu hydropower plant | Statement: [Lai Châu province, contains, Lai Châu hydropower plant]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Lai Châu hydropower plant
Context triple: [Lai Châu province, contains, Lai Châu hydropower plant]
  • A. Tri An Hydropower Plant
    Tri An Hydropower Plant is a major hydroelectric power station in southern Vietnam that generates electricity from the Dong Nai River and supports regional power supply and water management.
  • B. Kuri Chhu Hydropower Plant
    Kuri Chhu Hydropower Plant is a hydroelectric power station in Bhutan that harnesses the flow of the Kuri Chhu River to generate electricity for the national grid.
  • C. Nam Ou River hydropower project
    The Nam Ou River hydropower project is a large cascade of dams and power stations on Laos’s Nam Ou River developed primarily by Chinese companies to generate electricity and support regional energy and infrastructure goals.
  • D. Theun-Hinboun Hydropower Project
    The Theun-Hinboun Hydropower Project is a major hydroelectric dam and power generation scheme in Laos, developed to export electricity to neighboring countries while significantly impacting local river ecosystems and communities.
  • E. Nam Ou hydropower cascade
    The Nam Ou hydropower cascade is a series of large hydroelectric dams developed along Laos’s Nam Ou River to generate power and support regional energy infrastructure.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Lai Châu hydropower plant
Target entity description: Lai Châu hydropower plant is a major hydroelectric power station in northwestern Vietnam that contributes significantly to the country’s electricity generation and regional development.
  • A. Tri An Hydropower Plant
    Tri An Hydropower Plant is a major hydroelectric power station in southern Vietnam that generates electricity from the Dong Nai River and supports regional power supply and water management.
  • B. Kuri Chhu Hydropower Plant
    Kuri Chhu Hydropower Plant is a hydroelectric power station in Bhutan that harnesses the flow of the Kuri Chhu River to generate electricity for the national grid.
  • C. Nam Ou River hydropower project
    The Nam Ou River hydropower project is a large cascade of dams and power stations on Laos’s Nam Ou River developed primarily by Chinese companies to generate electricity and support regional energy and infrastructure goals.
  • D. Theun-Hinboun Hydropower Project
    The Theun-Hinboun Hydropower Project is a major hydroelectric dam and power generation scheme in Laos, developed to export electricity to neighboring countries while significantly impacting local river ecosystems and communities.
  • E. Nam Ou hydropower cascade
    The Nam Ou hydropower cascade is a series of large hydroelectric dams developed along Laos’s Nam Ou River to generate power and support regional energy infrastructure.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e8d460d88190abf0591c5c9d2b0c completed April 10, 2026, 12:11 p.m.
NER Named-entity recognition batch_69e61b45caec81909dafdf66b361effd completed April 20, 2026, 12:25 p.m.
Created at: April 10, 2026, 1:36 p.m.