Triple
T19383641
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Sea to Sky Gondola |
E484874
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | mountain gondola |
C1080
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: mountain gondola Context triple: [Sea to Sky Gondola, instanceOf, mountain gondola]
-
A.
mountain tramway
A mountain tramway is an aerial or cable-driven transportation system that carries passengers or goods up and down steep mountainous terrain using suspended or rail-guided cars.
-
B.
cable car system
chosen
A cable car system is a transportation network in which vehicles are pulled by continuously moving cables, typically used to move people or goods along steep or inaccessible routes such as mountainsides or urban hills.
-
C.
cable car station
A cable car station is a designated facility where passengers board, disembark, and transfer between cable-propelled vehicles, typically featuring platforms, ticketing areas, and equipment for operating and maintaining the cable system.
-
D.
surface ski lift
A surface ski lift is a ground-level ski lift system that pulls skiers and snowboarders uphill while they remain standing on the snow, typically using devices like T-bars, platter lifts, or rope tows.
-
E.
gondola car
A gondola car is an open-topped railroad freight car with low or high sides, designed for transporting bulk commodities such as coal, scrap metal, or aggregates.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8e8d460d88190abf0591c5c9d2b0c |
completed | April 10, 2026, 12:11 p.m. |
Created at: April 10, 2026, 1:35 p.m.