Triple

T19381107
Position Surface form Disambiguated ID Type / Status
Subject Franklinton, North Carolina E484812 entity
Predicate partOf P40 FINISHED
Object Raleigh–Durham metropolitan area NE NERFINISHED

Disambiguation candidates (1 decision)

The exact options the model was shown at each disambiguation step, with the option it chose highlighted — the evidence behind this triple's disambiguated ids.

NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Raleigh–Durham metropolitan area
Context triple: [Franklinton, North Carolina, partOf, Raleigh–Durham metropolitan area]
  • A. Raleigh–Durham area chosen
    The Raleigh–Durham area is a major metropolitan region in North Carolina centered around the cities of Raleigh and Durham and closely associated with the Research Triangle.
  • B. Durham–Chapel Hill metropolitan area
    The Durham–Chapel Hill metropolitan area is a North Carolina metro region centered on the cities of Durham and Chapel Hill, known for its major universities, research institutions, and role within the Research Triangle.
  • C. Raleigh–Cary metropolitan statistical area
    The Raleigh–Cary metropolitan statistical area is a major urban region in North Carolina centered on the cities of Raleigh and Cary, known for its rapid growth, strong technology and research sectors, and proximity to the Research Triangle Park.
  • D. Greensboro–High Point metropolitan area
    The Greensboro–High Point metropolitan area is a major urban and economic center in central North Carolina, anchored by the cities of Greensboro and High Point and forming part of the larger Piedmont Triad region.
  • E. Greensboro–Winston-Salem–High Point–Burlington CSA
    The Greensboro–Winston-Salem–High Point–Burlington CSA is a large multi-city combined statistical area in central North Carolina that encompasses much of the Piedmont Triad region and its surrounding communities.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

Stage Batch ID Job type Status
creating batch_69d8e8d460d88190abf0591c5c9d2b0c elicitation completed
NER batch_69e61a5fc1c48190b9d8fd5f5c10ec2c ner completed
Created at: April 10, 2026, 1:35 p.m.