Triple

T19377227
Position Surface form Disambiguated ID Type / Status
Subject Mott minimum metallic conductivity E484702 entity
Predicate instanceOf P0 FINISHED
Object transport property criterion C42009 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: transport property criterion
Context triple: [Mott minimum metallic conductivity, instanceOf, transport property criterion]
  • A. public transport service feature
    A public transport service feature is a specific characteristic, function, or amenity of a public transportation offering that affects how passengers access, experience, and evaluate the service.
  • B. transport model
    A transport model is a conceptual or mathematical representation used to simulate and analyze the movement of people, goods, or resources across a network or spatial system under various conditions and constraints.
  • C. public transport pricing scheme
    A public transport pricing scheme is a structured set of rules and fares that determines how passengers are charged for using public transit services based on factors such as distance, time, mode, and user category.
  • D. transportation standard
    A transportation standard is an agreed-upon set of rules, specifications, and protocols that ensure compatibility, safety, and efficiency across transportation systems, vehicles, and infrastructure.
  • E. public transport information system
    A public transport information system is a software platform that collects, processes, and disseminates real-time and scheduled data about public transit services to passengers, operators, and other stakeholders.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e8d460d88190abf0591c5c9d2b0c completed April 10, 2026, 12:11 p.m.
Created at: April 10, 2026, 1:35 p.m.