Triple
T19375007
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | North Colonnade |
E484643
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | pedestrian thoroughfare |
C6047
|
CONCEPT FINISHED |
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8e8d460d88190abf0591c5c9d2b0c |
completed | April 10, 2026, 12:11 p.m. |
Created at: April 10, 2026, 1:35 p.m.