Triple
T19361309
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Seoul City Tour Bus |
E484286
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | hop-on hop-off sightseeing bus service |
C31853
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: hop-on hop-off sightseeing bus service Context triple: [Seoul City Tour Bus, instanceOf, hop-on hop-off sightseeing bus service]
-
A.
tour bus
chosen
A tour bus is a large motor vehicle designed to transport groups of passengers on sightseeing or excursion trips, often featuring comfortable seating, large windows, and amenities for extended travel.
-
B.
regional bus service
A regional bus service is a public transportation system that operates scheduled bus routes connecting multiple towns or cities within a specific geographic area.
-
C.
limited-stop bus service
A limited-stop bus service is a transit route that only stops at selected key locations rather than every stop, reducing travel time for longer-distance passengers.
-
D.
local bus route
A local bus route is a designated path within a limited geographic area along which buses operate on a regular schedule to transport passengers between specific stops.
-
E.
demand-responsive bus service
A demand-responsive bus service is a flexible public transport system where routes and schedules are dynamically adjusted based on real-time passenger requests rather than fixed timetables and stops.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8e8d305088190ad13571532aa454c |
completed | April 10, 2026, 12:10 p.m. |
Created at: April 10, 2026, 1:34 p.m.