Triple
T19350176
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Nyaya Deepika |
E483994
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | commentarial work |
C15245
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: commentarial work Context triple: [Nyaya Deepika, instanceOf, commentarial work]
-
A.
editorial work
Editorial work is the process of reviewing, refining, and organizing written or visual content to improve clarity, accuracy, coherence, and overall quality for publication or distribution.
-
B.
scholastic commentary
chosen
A scholastic commentary is a structured, often line-by-line or question-and-answer exposition on an authoritative text, aiming to clarify its meaning, resolve apparent contradictions, and integrate it into a broader systematic framework of knowledge.
-
C.
linguistic work
A linguistic work is a created artifact—such as a text, speech, or signed performance—whose primary purpose is to convey meaning through a structured natural or formal language.
-
D.
work of biblical criticism
A work of biblical criticism is a scholarly text that analyzes the Bible’s origins, composition, historical context, literary features, and theological claims using critical methods and academic tools.
-
E.
journalistic work
A journalistic work is a researched, fact-based piece of communication produced to inform, analyze, or explain current or relevant events for a public audience.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8e8d244f8819080eb1f3491300db2 |
completed | April 10, 2026, 12:10 p.m. |
Created at: April 10, 2026, 1:34 p.m.