Triple

T19348061
Position Surface form Disambiguated ID Type / Status
Subject Lancaster, South Carolina E483935 entity
Predicate hasTransportation P105 FINISHED
Object South Carolina Highway 200 NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: South Carolina Highway 200 | Statement: [Lancaster, South Carolina, hasTransportation, South Carolina Highway 200]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: South Carolina Highway 200
Context triple: [Lancaster, South Carolina, hasTransportation, South Carolina Highway 200]
  • A. South Carolina Highway 261
    South Carolina Highway 261 is a state highway running through central South Carolina that connects several rural communities and historic areas, including Stateburg.
  • B. South Carolina Highway 22
    South Carolina Highway 22 is a major four-lane expressway in northeastern South Carolina that serves as a key route to the Grand Strand and Myrtle Beach area.
  • C. South Carolina Highway 27
    South Carolina Highway 27 is a primary state highway in South Carolina that serves as a local connector route in the Lowcountry region, including the town of Ridgeville.
  • D. South Carolina Highway 28
    South Carolina Highway 28 is a primary state highway in northwestern South Carolina that connects several communities, including Seneca, and serves as an important regional route for local and through traffic.
  • E. South Carolina Highway 39
    South Carolina Highway 39 is a primary state highway running through central South Carolina, connecting several rural communities and small towns, including Wagener.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: South Carolina Highway 200
Target entity description: South Carolina Highway 200 is a primary state highway in northern South Carolina that connects the city of Lancaster to the North Carolina state line and surrounding communities.
  • A. South Carolina Highway 261
    South Carolina Highway 261 is a state highway running through central South Carolina that connects several rural communities and historic areas, including Stateburg.
  • B. South Carolina Highway 22
    South Carolina Highway 22 is a major four-lane expressway in northeastern South Carolina that serves as a key route to the Grand Strand and Myrtle Beach area.
  • C. South Carolina Highway 27
    South Carolina Highway 27 is a primary state highway in South Carolina that serves as a local connector route in the Lowcountry region, including the town of Ridgeville.
  • D. South Carolina Highway 28
    South Carolina Highway 28 is a primary state highway in northwestern South Carolina that connects several communities, including Seneca, and serves as an important regional route for local and through traffic.
  • E. South Carolina Highway 39
    South Carolina Highway 39 is a primary state highway running through central South Carolina, connecting several rural communities and small towns, including Wagener.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e8d244f8819080eb1f3491300db2 completed April 10, 2026, 12:10 p.m.
NER Named-entity recognition batch_69e6185c95248190b1e5bb8626489767 completed April 20, 2026, 12:13 p.m.
Created at: April 10, 2026, 1:34 p.m.