Triple

T19335108
Position Surface form Disambiguated ID Type / Status
Subject Zhinvali Dam E483601 entity
Predicate operator P179 FINISHED
Object Georgian State Electrosystem NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Georgian State Electrosystem | Statement: [Zhinvali Dam, operator, Georgian State Electrosystem]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Georgian State Electrosystem
Context triple: [Zhinvali Dam, operator, Georgian State Electrosystem]
  • A. Shaori–Tskhinvali hydroelectric system
    The Shaori–Tskhinvali hydroelectric system is a Georgian hydroelectric power complex that uses water from the Shaori Reservoir and related infrastructure to generate electricity for the surrounding region.
  • B. Municipal Electric Authority of Georgia
    The Municipal Electric Authority of Georgia is a public power agency that provides wholesale electricity and related services to member communities across Georgia.
  • C. Georgian Railway Telecom
    Georgian Railway Telecom is a telecommunications company in Georgia that provides communication and network services, originally established to support and leverage the infrastructure of the national railway system.
  • D. Siberian Unified Power System
    The Siberian Unified Power System is a major regional segment of Russia’s national electric grid that integrates and distributes electricity generated by large Siberian power plants.
  • E. Tbilisi water supply system
    The Tbilisi water supply system is the municipal infrastructure network that sources, treats, and distributes drinking water to the city of Tbilisi and its surrounding areas.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Georgian State Electrosystem
Target entity description: Georgian State Electrosystem is Georgia’s national electricity transmission system operator, responsible for managing and maintaining the country’s high-voltage power grid and ensuring reliable power supply.
  • A. Shaori–Tskhinvali hydroelectric system
    The Shaori–Tskhinvali hydroelectric system is a Georgian hydroelectric power complex that uses water from the Shaori Reservoir and related infrastructure to generate electricity for the surrounding region.
  • B. Municipal Electric Authority of Georgia
    The Municipal Electric Authority of Georgia is a public power agency that provides wholesale electricity and related services to member communities across Georgia.
  • C. Georgian Railway Telecom
    Georgian Railway Telecom is a telecommunications company in Georgia that provides communication and network services, originally established to support and leverage the infrastructure of the national railway system.
  • D. Siberian Unified Power System
    The Siberian Unified Power System is a major regional segment of Russia’s national electric grid that integrates and distributes electricity generated by large Siberian power plants.
  • E. Tbilisi water supply system
    The Tbilisi water supply system is the municipal infrastructure network that sources, treats, and distributes drinking water to the city of Tbilisi and its surrounding areas.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e8d13e3c81909d91d1d5ec37c095 completed April 10, 2026, 12:10 p.m.
NER Named-entity recognition batch_69e61644b80c819080f9bca086424a36 completed April 20, 2026, 12:04 p.m.
Created at: April 10, 2026, 1:33 p.m.