Triple

T19335105
Position Surface form Disambiguated ID Type / Status
Subject Zhinvali Dam E483601 entity
Predicate hasPowerPlant P9904 FINISHED
Object Zhinvali Hydroelectric Power Plant NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Zhinvali Hydroelectric Power Plant | Statement: [Zhinvali Dam, hasPowerPlant, Zhinvali Hydroelectric Power Plant]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Zhinvali Hydroelectric Power Plant
Context triple: [Zhinvali Dam, hasPowerPlant, Zhinvali Hydroelectric Power Plant]
  • A. Khrami II Hydroelectric Power Plant
    Khrami II Hydroelectric Power Plant is a hydroelectric facility on the Khrami River in Georgia that generates electricity by harnessing the river’s flow through a dam-based power station.
  • B. Er'tan Hydropower Station
    Er'tan Hydropower Station is a major hydroelectric power facility in Sichuan, China, known for its large arch dam and role in regional power generation and tourism.
  • C. Kurpsai Hydroelectric Power Plant
    Kurpsai Hydroelectric Power Plant is a major hydroelectric facility in Kyrgyzstan that generates electricity by harnessing the flow of the Naryn River.
  • D. Khrami I Hydroelectric Power Plant
    Khrami I Hydroelectric Power Plant is a hydroelectric facility on the Khrami River in Georgia that generates electricity by harnessing the river’s flow through a dam-based power station.
  • E. Lotru-Ciunget Hydropower Plant
    The Lotru-Ciunget Hydropower Plant is a major Romanian hydroelectric facility that harnesses the Lotru River to generate electricity for the national grid.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Zhinvali Hydroelectric Power Plant
Target entity description: The Zhinvali Hydroelectric Power Plant is a hydroelectric facility in Georgia that generates electricity using water impounded by the Zhinvali Dam on the Aragvi River.
  • A. Khrami II Hydroelectric Power Plant
    Khrami II Hydroelectric Power Plant is a hydroelectric facility on the Khrami River in Georgia that generates electricity by harnessing the river’s flow through a dam-based power station.
  • B. Er'tan Hydropower Station
    Er'tan Hydropower Station is a major hydroelectric power facility in Sichuan, China, known for its large arch dam and role in regional power generation and tourism.
  • C. Kurpsai Hydroelectric Power Plant
    Kurpsai Hydroelectric Power Plant is a major hydroelectric facility in Kyrgyzstan that generates electricity by harnessing the flow of the Naryn River.
  • D. Khrami I Hydroelectric Power Plant
    Khrami I Hydroelectric Power Plant is a hydroelectric facility on the Khrami River in Georgia that generates electricity by harnessing the river’s flow through a dam-based power station.
  • E. Lotru-Ciunget Hydropower Plant
    The Lotru-Ciunget Hydropower Plant is a major Romanian hydroelectric facility that harnesses the Lotru River to generate electricity for the national grid.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e8d13e3c81909d91d1d5ec37c095 completed April 10, 2026, 12:10 p.m.
NER Named-entity recognition batch_69e61644b80c819080f9bca086424a36 completed April 20, 2026, 12:04 p.m.
Created at: April 10, 2026, 1:33 p.m.