Triple

T19327860
Position Surface form Disambiguated ID Type / Status
Subject p-adic numbers E483405 entity
Predicate isCompleteWithRespectTo P135623 FINISHED
Object p-adic metric LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: p-adic metric | Statement: [p-adic numbers, isCompleteWithRespectTo, p-adic metric]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: isCompleteWithRespectTo
Context triple: [p-adic numbers, isCompleteWithRespectTo, p-adic metric]
  • A. isCompleteFor
    Indicates that one entity fully satisfies or finishes the requirements, scope, or intended purpose of another entity.
  • B. isComplete
    Indicates that an action, process, or object has finished all required steps or reached its final state with nothing remaining to be done.
  • C. isCompleteOn
    Indicates that an activity, task, or process has been fully finished or achieved by a specific point in time or on a specific date.
  • D. isIncompletenessSubjectTo
    Indicates that an incompleteness, deficiency, or lack in something is governed, constrained, or determined by a particular condition, rule, or authority.
  • E. hasCompleted
    Indicates that an entity has finished or successfully carried out a specified task, process, or activity.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e8d13e3c81909d91d1d5ec37c095 completed April 10, 2026, 12:10 p.m.
NER Named-entity recognition batch_69e6163f32f48190be17cccf4e537372 completed April 20, 2026, 12:04 p.m.
PD Predicate disambiguation batch_69e4dd0ef66881909d489d634eee817a completed April 19, 2026, 1:47 p.m.
PDg Predicate description generation batch_69e4e4709d4481908c280cdd2ac18977 completed April 19, 2026, 2:19 p.m.
Created at: April 10, 2026, 1:33 p.m.