Triple

T19300056
Position Surface form Disambiguated ID Type / Status
Subject Carrera 7 (Séptima) E482668 entity
Predicate parallelTo P1868 FINISHED
Object Carrera 13 (Bogotá) NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Carrera 13 (Bogotá) | Statement: [Carrera 7 (Séptima), parallelTo, Carrera 13 (Bogotá)]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Carrera 13 (Bogotá)
Context triple: [Carrera 7 (Séptima), parallelTo, Carrera 13 (Bogotá)]
  • A. Bogotá–Facatativá corridor
    The Bogotá–Facatativá corridor is a key transportation axis in central Colombia that links the capital city of Bogotá with the town of Facatativá and other municipalities in the department of Cundinamarca.
  • B. Carrera 7 (Séptima)
    Carrera 7 (Séptima) is one of Bogotá’s main and most historic thoroughfares, running north–south through the city and serving as a key commercial and cultural axis.
  • C. Avenida Circunvalar (Bogotá)
    Avenida Circunvalar (Bogotá) is a major hillside arterial road that runs along the eastern edge of Bogotá, connecting several central and northern neighborhoods while skirting the Andean mountains.
  • D. Bogotá–Tenjo corridor
    The Bogotá–Tenjo corridor is a rapidly urbanizing and industrializing stretch of land in the Bogotá savanna that connects the Colombian capital with the nearby municipality of Tenjo.
  • E. Carrera 2 in Bogotá
    Carrera 2 in Bogotá is a historic street in the city’s La Candelaria district, known for its colonial architecture and proximity to cultural landmarks and plazas.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Carrera 13 (Bogotá)
Target entity description: Carrera 13 is a major north–south arterial road in Bogotá, Colombia, running through central and northern districts and serving as an important commercial and transportation corridor.
  • A. Bogotá–Facatativá corridor
    The Bogotá–Facatativá corridor is a key transportation axis in central Colombia that links the capital city of Bogotá with the town of Facatativá and other municipalities in the department of Cundinamarca.
  • B. Carrera 7 (Séptima)
    Carrera 7 (Séptima) is one of Bogotá’s main and most historic thoroughfares, running north–south through the city and serving as a key commercial and cultural axis.
  • C. Avenida Circunvalar (Bogotá)
    Avenida Circunvalar (Bogotá) is a major hillside arterial road that runs along the eastern edge of Bogotá, connecting several central and northern neighborhoods while skirting the Andean mountains.
  • D. Bogotá–Tenjo corridor
    The Bogotá–Tenjo corridor is a rapidly urbanizing and industrializing stretch of land in the Bogotá savanna that connects the Colombian capital with the nearby municipality of Tenjo.
  • E. Carrera 2 in Bogotá
    Carrera 2 in Bogotá is a historic street in the city’s La Candelaria district, known for its colonial architecture and proximity to cultural landmarks and plazas.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e8d04d5c8190baa816986f2b1d1e completed April 10, 2026, 12:10 p.m.
NER Named-entity recognition batch_69e5fc895c68819096d06746f1b84e06 completed April 20, 2026, 10:14 a.m.
Created at: April 10, 2026, 1:31 p.m.