Triple

T19294918
Position Surface form Disambiguated ID Type / Status
Subject AMO E482538 entity
Predicate instanceOf P0 FINISHED
Object research studio C21006 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: research studio
Context triple: [AMO, instanceOf, research studio]
  • A. research and design studio chosen
    A research and design studio is a collaborative environment where systematic inquiry and creative experimentation are combined to explore, prototype, and refine innovative concepts, products, or experiences.
  • B. research project
    A research project is a structured, systematic investigation designed to answer specific questions or test hypotheses by collecting, analyzing, and interpreting data within a defined scope and timeframe.
  • C. research facility
    A research facility is a specialized institution equipped with laboratories, instruments, and resources where scientists and experts systematically investigate, experiment, and develop new knowledge or technologies.
  • D. research team
    A research team is a collaborative group of individuals with complementary expertise who systematically investigate questions or problems to generate new knowledge or solutions.
  • E. research organization
    A research organization is an institution that systematically investigates specific questions or problems to generate new knowledge, technologies, or insights, often within scientific, academic, or applied domains.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e8cf61b0819096fe3e4107827c4e completed April 10, 2026, 12:10 p.m.
Created at: April 10, 2026, 1:31 p.m.