Triple
T19293665
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Hohensalzburg Fortress funicular |
E482504
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | hillside railway |
C41189
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: hillside railway Context triple: [Hohensalzburg Fortress funicular, instanceOf, hillside railway]
-
A.
incline railway
chosen
An incline railway is a transportation system that uses cable-hauled rail cars to move passengers or goods up and down steep slopes along fixed tracks.
-
B.
mountain rack railway
A mountain rack railway is a steep-gradient railway system that uses a toothed rack rail engaged by a cogwheel on the train to provide additional traction and braking on mountainous terrain.
-
C.
narrow-gauge railway line
A narrow-gauge railway line is a railroad whose track gauge is significantly smaller than the standard gauge, typically used in regions with difficult terrain, lower construction costs, or specialized transport needs.
-
D.
hillside sign
A hillside sign is a large-scale arrangement of letters or symbols installed on a slope or hillside, typically used to identify a place, promote a message, or serve as a landmark visible from a distance.
-
E.
railway line
A railway line is a fixed transportation route consisting of tracks, signaling, and related infrastructure along which trains operate between defined locations.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8e8cf61b0819096fe3e4107827c4e |
completed | April 10, 2026, 12:10 p.m. |
Created at: April 10, 2026, 1:31 p.m.