Triple
T19292103
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Plan XVII |
E482467
|
entity |
| Predicate | planningPeriodEnd |
P127678
|
FINISHED |
| Object | 1914 |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 1914 | Statement: [Plan XVII, planningPeriodEnd, 1914]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: planningPeriodEnd Context triple: [Plan XVII, planningPeriodEnd, 1914]
-
A.
governedPeriodEnd
Indicates the point in time at which a governing authority’s control or jurisdiction over something comes to an end.
-
B.
associatedPeriodEnd
Indicates the ending point or final date of the time period with which something is associated.
-
C.
narrativePeriodEnd
Indicates the point in time at which a described narrative, story, or event sequence comes to an end.
-
D.
plannedEndYear
chosen
Indicates the calendar year in which an activity, project, or plan is intended or scheduled to be completed.
-
E.
focusPeriodEnd
Indicates the point in time at which a specified focus period or interval concludes.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8e8cf61b0819096fe3e4107827c4e |
completed | April 10, 2026, 12:10 p.m. |
| NER | Named-entity recognition | batch_69e5fc819a7881909a7afbd06d9dd3f0 |
completed | April 20, 2026, 10:14 a.m. |
| PD | Predicate disambiguation | batch_69e4dd0bc7508190a6f9d56bd4c3404f |
completed | April 19, 2026, 1:47 p.m. |
Created at: April 10, 2026, 1:31 p.m.