Triple

T19292103
Position Surface form Disambiguated ID Type / Status
Subject Plan XVII E482467 entity
Predicate planningPeriodEnd P127678 FINISHED
Object 1914 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 1914 | Statement: [Plan XVII, planningPeriodEnd, 1914]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: planningPeriodEnd
Context triple: [Plan XVII, planningPeriodEnd, 1914]
  • A. governedPeriodEnd
    Indicates the point in time at which a governing authority’s control or jurisdiction over something comes to an end.
  • B. associatedPeriodEnd
    Indicates the ending point or final date of the time period with which something is associated.
  • C. narrativePeriodEnd
    Indicates the point in time at which a described narrative, story, or event sequence comes to an end.
  • D. plannedEndYear chosen
    Indicates the calendar year in which an activity, project, or plan is intended or scheduled to be completed.
  • E. focusPeriodEnd
    Indicates the point in time at which a specified focus period or interval concludes.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e8cf61b0819096fe3e4107827c4e completed April 10, 2026, 12:10 p.m.
NER Named-entity recognition batch_69e5fc819a7881909a7afbd06d9dd3f0 completed April 20, 2026, 10:14 a.m.
PD Predicate disambiguation batch_69e4dd0bc7508190a6f9d56bd4c3404f completed April 19, 2026, 1:47 p.m.
Created at: April 10, 2026, 1:31 p.m.