Triple

T19292102
Position Surface form Disambiguated ID Type / Status
Subject Plan XVII E482467 entity
Predicate planningPeriodStart P113284 FINISHED
Object 1912 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 1912 | Statement: [Plan XVII, planningPeriodStart, 1912]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: planningPeriodStart
Context triple: [Plan XVII, planningPeriodStart, 1912]
  • A. planningStartYear chosen
    Indicates the calendar year in which planning for an activity, project, or process begins.
  • B. usePeriodStart
    Indicates that an entity begins to be used or becomes active starting from a specified time period.
  • C. recordedInPeriodStart
    Indicates that an event or record began or was first documented at the start of a specified time period.
  • D. narratedPeriodStart
    Indicates the point in time at which the narrated or described period begins.
  • E. effectivePeriodStart
    Indicates the date and time when a specified condition, status, or agreement becomes valid or goes into effect.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e8cf61b0819096fe3e4107827c4e completed April 10, 2026, 12:10 p.m.
NER Named-entity recognition batch_69e5fc819a7881909a7afbd06d9dd3f0 completed April 20, 2026, 10:14 a.m.
PD Predicate disambiguation batch_69e4dd0bc7508190a6f9d56bd4c3404f completed April 19, 2026, 1:47 p.m.
Created at: April 10, 2026, 1:31 p.m.