Triple
T19286757
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Madawaska River |
E482332
|
entity |
| Predicate | hasDam |
P8736
|
FINISHED |
| Object | Barrett Chute Generating Station |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Barrett Chute Generating Station | Statement: [Madawaska River, hasDam, Barrett Chute Generating Station]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Barrett Chute Generating Station Context triple: [Madawaska River, hasDam, Barrett Chute Generating Station]
-
A.
Mountain Chute Generating Station
Mountain Chute Generating Station is a hydroelectric power facility located on the Madawaska River in Ontario, Canada.
-
B.
Kelsey Generating Station
Kelsey Generating Station is a hydroelectric power plant located on the Nelson River in northern Manitoba, Canada, that generates electricity for the provincial grid.
-
C.
La Gabelle Generating Station
La Gabelle Generating Station is a hydroelectric power plant in Quebec, Canada, operated by Hydro-Québec and known for harnessing the flow of the Saint-Maurice River to produce electricity.
-
D.
Smoky Falls Generating Station
Smoky Falls Generating Station is a hydroelectric power plant in northern Ontario, Canada, that harnesses the flow of the Mattagami River to generate electricity.
-
E.
McArthur Falls Generating Station
McArthur Falls Generating Station is a hydroelectric power plant on the Winnipeg River in Manitoba, Canada, that generates electricity by harnessing the river’s flow.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Barrett Chute Generating Station Target entity description: Barrett Chute Generating Station is a hydroelectric power facility located on the Madawaska River in Ontario, Canada.
-
A.
Mountain Chute Generating Station
Mountain Chute Generating Station is a hydroelectric power facility located on the Madawaska River in Ontario, Canada.
-
B.
Kelsey Generating Station
Kelsey Generating Station is a hydroelectric power plant located on the Nelson River in northern Manitoba, Canada, that generates electricity for the provincial grid.
-
C.
La Gabelle Generating Station
La Gabelle Generating Station is a hydroelectric power plant in Quebec, Canada, operated by Hydro-Québec and known for harnessing the flow of the Saint-Maurice River to produce electricity.
-
D.
Smoky Falls Generating Station
Smoky Falls Generating Station is a hydroelectric power plant in northern Ontario, Canada, that harnesses the flow of the Mattagami River to generate electricity.
-
E.
McArthur Falls Generating Station
McArthur Falls Generating Station is a hydroelectric power plant on the Winnipeg River in Manitoba, Canada, that generates electricity by harnessing the river’s flow.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8e8cf61b0819096fe3e4107827c4e |
completed | April 10, 2026, 12:10 p.m. |
| NER | Named-entity recognition | batch_69e5fc024a7081909a25d7cc4e048f79 |
completed | April 20, 2026, 10:12 a.m. |
Created at: April 10, 2026, 1:30 p.m.