Triple

T19281807
Position Surface form Disambiguated ID Type / Status
Subject Bilibino Nuclear Power Plant E482205 entity
Predicate heatSupplyCapacity_GcalPerHour P22949 FINISHED
Object approximately 80 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: approximately 80 | Statement: [Bilibino Nuclear Power Plant, heatSupplyCapacity_GcalPerHour, approximately 80]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: heatSupplyCapacity_GcalPerHour
Context triple: [Bilibino Nuclear Power Plant, heatSupplyCapacity_GcalPerHour, approximately 80]
  • A. thermalPower
    Indicates the amount of heat energy per unit time that a system, device, or process generates, transfers, or consumes.
  • B. capacityPerHour chosen
    Indicates the maximum amount of output or throughput an entity can handle or produce in one hour.
  • C. grossElectricalCapacity_MWe
    Indicates the total electrical power output capacity of a generating unit, measured in megawatts electric (MWe), before accounting for internal power consumption or losses.
  • D. netElectricalCapacity_MWe
    Indicates the relationship specifying an entity’s net electrical power generation capacity, measured in megawatts electric (MWe), after accounting for internal power consumption.
  • E. unitCapacity
    Indicates the maximum quantity or load that a single unit is designed or allowed to hold, process, or accommodate.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e8cf61b0819096fe3e4107827c4e completed April 10, 2026, 12:10 p.m.
NER Named-entity recognition batch_69e5fbff1e6c819094ae6a5ad40adb65 completed April 20, 2026, 10:12 a.m.
PD Predicate disambiguation batch_69e4dd07a7208190afcd51ba1dc87c33 completed April 19, 2026, 1:47 p.m.
Created at: April 10, 2026, 1:30 p.m.