Triple
T19281776
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Bilibino Nuclear Power Plant |
E482205
|
entity |
| Predicate | electricalCapacityPerReactor_MWe |
P135437
|
FINISHED |
| Object | 12 |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 12 | Statement: [Bilibino Nuclear Power Plant, electricalCapacityPerReactor_MWe, 12]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: electricalCapacityPerReactor_MWe Context triple: [Bilibino Nuclear Power Plant, electricalCapacityPerReactor_MWe, 12]
-
A.
thermalCapacityPerReactor_MWth
Indicates the amount of thermal power capacity, measured in megawatts thermal (MWth), associated with each individual reactor.
-
B.
grossElectricalCapacity_MWe
Indicates the total electrical power output capacity of a generating unit, measured in megawatts electric (MWe), before accounting for internal power consumption or losses.
-
C.
plannedNumberOfReactors
Indicates the total number of reactors that are intended or scheduled to be built, installed, or operated for a given facility or project.
-
D.
netElectricalCapacity_MWe
Indicates the relationship specifying an entity’s net electrical power generation capacity, measured in megawatts electric (MWe), after accounting for internal power consumption.
-
E.
totalElectricalCapacity_MWe
Indicates the total electrical power generation capacity, measured in megawatts electric (MWe), that an entity can produce or supply.
- F. None of above. chosen
Provenance (4 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8e8cf61b0819096fe3e4107827c4e |
completed | April 10, 2026, 12:10 p.m. |
| NER | Named-entity recognition | batch_69e5fbff1e6c819094ae6a5ad40adb65 |
completed | April 20, 2026, 10:12 a.m. |
| PD | Predicate disambiguation | batch_69e4dd07a7208190afcd51ba1dc87c33 |
completed | April 19, 2026, 1:47 p.m. |
| PDg | Predicate description generation | batch_69e4df51ac6c819091ce72b07790ffa6 |
completed | April 19, 2026, 1:57 p.m. |
Created at: April 10, 2026, 1:30 p.m.