Triple

T19281776
Position Surface form Disambiguated ID Type / Status
Subject Bilibino Nuclear Power Plant E482205 entity
Predicate electricalCapacityPerReactor_MWe P135437 FINISHED
Object 12 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 12 | Statement: [Bilibino Nuclear Power Plant, electricalCapacityPerReactor_MWe, 12]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: electricalCapacityPerReactor_MWe
Context triple: [Bilibino Nuclear Power Plant, electricalCapacityPerReactor_MWe, 12]
  • A. thermalCapacityPerReactor_MWth
    Indicates the amount of thermal power capacity, measured in megawatts thermal (MWth), associated with each individual reactor.
  • B. grossElectricalCapacity_MWe
    Indicates the total electrical power output capacity of a generating unit, measured in megawatts electric (MWe), before accounting for internal power consumption or losses.
  • C. plannedNumberOfReactors
    Indicates the total number of reactors that are intended or scheduled to be built, installed, or operated for a given facility or project.
  • D. netElectricalCapacity_MWe
    Indicates the relationship specifying an entity’s net electrical power generation capacity, measured in megawatts electric (MWe), after accounting for internal power consumption.
  • E. totalElectricalCapacity_MWe
    Indicates the total electrical power generation capacity, measured in megawatts electric (MWe), that an entity can produce or supply.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e8cf61b0819096fe3e4107827c4e completed April 10, 2026, 12:10 p.m.
NER Named-entity recognition batch_69e5fbff1e6c819094ae6a5ad40adb65 completed April 20, 2026, 10:12 a.m.
PD Predicate disambiguation batch_69e4dd07a7208190afcd51ba1dc87c33 completed April 19, 2026, 1:47 p.m.
PDg Predicate description generation batch_69e4df51ac6c819091ce72b07790ffa6 completed April 19, 2026, 1:57 p.m.
Created at: April 10, 2026, 1:30 p.m.