Triple
T19277976
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Ohio River Sternwheel Festival |
E482107
|
entity |
| Predicate | endDayPattern |
P122062
|
FINISHED |
| Object | Sunday |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Sunday | Statement: [Ohio River Sternwheel Festival, endDayPattern, Sunday]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: endDayPattern Context triple: [Ohio River Sternwheel Festival, endDayPattern, Sunday]
-
A.
weekEndDay
Indicates that a given day falls on a weekend rather than a weekday.
-
B.
typicalEndDay
chosen
Indicates the usual or most common day on which an event, activity, or state typically concludes.
-
C.
endDate
Indicates the point in time at which an event, state, or relationship stops being valid or comes to a conclusion.
-
D.
endOf
Indicates that one entity marks the terminating point or final boundary of another entity, event, or interval.
-
E.
weekendEndDate
Indicates the calendar date on which a weekend period concludes.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8e8ce54cc8190998418ff1f66ef28 |
completed | April 10, 2026, 12:10 p.m. |
| NER | Named-entity recognition | batch_69e5fbbe6e9c8190a7fa2ef3aa598e6c |
completed | April 20, 2026, 10:11 a.m. |
| PD | Predicate disambiguation | batch_69e4dd07a7208190afcd51ba1dc87c33 |
completed | April 19, 2026, 1:47 p.m. |
Created at: April 10, 2026, 1:30 p.m.