Triple
T19276642
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Evergreen 3 project |
E482074
|
entity |
| Predicate | partOf |
P40
|
FINISHED |
| Object | Evergreen rail improvement schemes |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Evergreen rail improvement schemes | Statement: [Evergreen 3 project, partOf, Evergreen rail improvement schemes]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Evergreen rail improvement schemes Context triple: [Evergreen 3 project, partOf, Evergreen rail improvement schemes]
-
A.
The Reshaping of British Railways
The Reshaping of British Railways was a 1963 British government report by Dr. Richard Beeching that recommended widespread railway line and station closures, fundamentally reshaping the UK rail network.
-
B.
British Railways Modernisation Plan
The British Railways Modernisation Plan was a major post-war programme to transform and modernize Britain’s railway network through widespread dieselisation, electrification, and infrastructure upgrades.
-
C.
TransPennine Route Upgrade (TPRU) programme
The TransPennine Route Upgrade (TPRU) programme is a major UK rail infrastructure project to modernise and increase capacity, reliability, and connectivity on the key TransPennine rail corridor across northern England.
-
D.
Shillingstone Station Project
Shillingstone Station Project is a heritage railway preservation initiative dedicated to restoring and interpreting the former Shillingstone station on the historic Somerset and Dorset Joint Railway.
-
E.
Rail Regulator
The Rail Regulator was the former independent statutory body in Great Britain responsible for overseeing and enforcing the economic and safety regulation of the railway industry before its functions were transferred to successor regulators.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Evergreen rail improvement schemes Target entity description: Evergreen rail improvement schemes are a series of major infrastructure projects aimed at modernizing and enhancing rail services and connectivity in the UK’s Chilterns and surrounding regions.
-
A.
The Reshaping of British Railways
The Reshaping of British Railways was a 1963 British government report by Dr. Richard Beeching that recommended widespread railway line and station closures, fundamentally reshaping the UK rail network.
-
B.
British Railways Modernisation Plan
The British Railways Modernisation Plan was a major post-war programme to transform and modernize Britain’s railway network through widespread dieselisation, electrification, and infrastructure upgrades.
-
C.
TransPennine Route Upgrade (TPRU) programme
The TransPennine Route Upgrade (TPRU) programme is a major UK rail infrastructure project to modernise and increase capacity, reliability, and connectivity on the key TransPennine rail corridor across northern England.
-
D.
Shillingstone Station Project
Shillingstone Station Project is a heritage railway preservation initiative dedicated to restoring and interpreting the former Shillingstone station on the historic Somerset and Dorset Joint Railway.
-
E.
Rail Regulator
The Rail Regulator was the former independent statutory body in Great Britain responsible for overseeing and enforcing the economic and safety regulation of the railway industry before its functions were transferred to successor regulators.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8e8ce54cc8190998418ff1f66ef28 |
completed | April 10, 2026, 12:10 p.m. |
| NER | Named-entity recognition | batch_69e5fbbd5f34819086535f28fd880411 |
completed | April 20, 2026, 10:11 a.m. |
Created at: April 10, 2026, 1:29 p.m.