Triple

T19276632
Position Surface form Disambiguated ID Type / Status
Subject Evergreen 3 project E482074 entity
Predicate instanceOf P0 FINISHED
Object railway upgrade scheme C17897 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: railway upgrade scheme
Context triple: [Evergreen 3 project, instanceOf, railway upgrade scheme]
  • A. railway modernisation project chosen
    A railway modernisation project is an initiative that upgrades existing rail infrastructure, technology, and operations to improve capacity, safety, efficiency, and passenger experience.
  • B. public railway
    A public railway is a government- or publicly-owned rail transport system that provides scheduled passenger and/or freight services accessible to the general population, typically operating on standardized tracks and infrastructure.
  • C. railway locomotive standardization scheme
    A railway locomotive standardization scheme is a systematic framework for defining, organizing, and unifying the design, classification, and specifications of locomotives across a rail network to ensure compatibility, efficiency, and ease of maintenance.
  • D. railway network
    A railway network is an interconnected system of tracks, stations, signaling, and rolling stock that enables the organized movement of trains between multiple locations.
  • E. railway policy implementation
    Railway policy implementation is the process of translating rail-related laws, regulations, and strategic plans into concrete operational actions, projects, and standards across the railway system.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e8ce54cc8190998418ff1f66ef28 completed April 10, 2026, 12:10 p.m.
Created at: April 10, 2026, 1:29 p.m.