Triple
T19274820
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Netul Landing |
E482021
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | visitor access area |
C29801
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: visitor access area Context triple: [Netul Landing, instanceOf, visitor access area]
-
A.
entrance
An entrance is a designated point of access that allows people or objects to move from the outside into a defined space or area.
-
B.
limited entry area
chosen
A limited entry area is a designated space where access is restricted to authorized individuals or under specific conditions to ensure safety, security, or resource protection.
-
C.
tourist attraction area
A tourist attraction area is a designated geographic location that offers notable natural, cultural, historical, or recreational features and supporting facilities that draw visitors for leisure, education, or entertainment.
-
D.
pedestrian access point
A pedestrian access point is a designated location where people on foot can enter, exit, or cross into a specific area, pathway, or transportation facility.
-
E.
entrance to a national park
The entrance to a national park is the designated access point where visitors transition from surrounding areas into the protected natural landscape, often marked by signage, gates, and visitor facilities.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8e8ce54cc8190998418ff1f66ef28 |
completed | April 10, 2026, 12:10 p.m. |
Created at: April 10, 2026, 1:29 p.m.