Triple
T19271473
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Russia–China border |
E481937
|
entity |
| Predicate | hasBorderCrossing |
P4105
|
FINISHED |
| Object | Hunchun–Khasan crossing |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Hunchun–Khasan crossing | Statement: [Russia–China border, hasBorderCrossing, Hunchun–Khasan crossing]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Hunchun–Khasan crossing Context triple: [Russia–China border, hasBorderCrossing, Hunchun–Khasan crossing]
-
A.
Manzhouli–Zabaykalsk crossing
The Manzhouli–Zabaykalsk crossing is a major rail and road gateway between northeastern China and eastern Russia, serving as a key hub for trans-Eurasian trade and transport.
-
B.
Dandong–Sinuiju railway
The Dandong–Sinuiju railway is a key cross-border rail link between China and North Korea, serving as one of the main routes for trade and transportation between the two countries.
-
C.
Tatopani–Zhangmu border crossing
The Tatopani–Zhangmu border crossing is a key trans-Himalayan trade and transit point linking Nepal and China, historically serving as one of the busiest overland routes between the two countries.
-
D.
Luhamaa–Shumilkino crossing
The Luhamaa–Shumilkino crossing is an international road border checkpoint connecting Estonia and Russia, serving as a key transit point for passenger and freight traffic between the two countries.
-
E.
Koidula–Kunitsyna Gora crossing
Koidula–Kunitsyna Gora crossing is an international road and rail checkpoint linking southeastern Estonia with Russia, serving as a key transit point for passengers and freight between the two countries.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Hunchun–Khasan crossing Target entity description: The Hunchun–Khasan crossing is an international rail and road border checkpoint linking Russia and China near the Tumen River in the Russian Far East.
-
A.
Manzhouli–Zabaykalsk crossing
The Manzhouli–Zabaykalsk crossing is a major rail and road gateway between northeastern China and eastern Russia, serving as a key hub for trans-Eurasian trade and transport.
-
B.
Dandong–Sinuiju railway
The Dandong–Sinuiju railway is a key cross-border rail link between China and North Korea, serving as one of the main routes for trade and transportation between the two countries.
-
C.
Tatopani–Zhangmu border crossing
The Tatopani–Zhangmu border crossing is a key trans-Himalayan trade and transit point linking Nepal and China, historically serving as one of the busiest overland routes between the two countries.
-
D.
Luhamaa–Shumilkino crossing
The Luhamaa–Shumilkino crossing is an international road border checkpoint connecting Estonia and Russia, serving as a key transit point for passenger and freight traffic between the two countries.
-
E.
Koidula–Kunitsyna Gora crossing
Koidula–Kunitsyna Gora crossing is an international road and rail checkpoint linking southeastern Estonia with Russia, serving as a key transit point for passengers and freight between the two countries.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8e8ce54cc8190998418ff1f66ef28 |
completed | April 10, 2026, 12:10 p.m. |
| NER | Named-entity recognition | batch_69e5fbb8bea08190b5c65eebe67dccbb |
completed | April 20, 2026, 10:11 a.m. |
Created at: April 10, 2026, 1:29 p.m.