Triple

T19267420
Position Surface form Disambiguated ID Type / Status
Subject San Juan River (Argentina) E481822 entity
Predicate hasHydroelectricPlant P15311 FINISHED
Object Punta Negra Dam NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Punta Negra Dam | Statement: [San Juan River (Argentina), hasHydroelectricPlant, Punta Negra Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Punta Negra Dam
Context triple: [San Juan River (Argentina), hasHydroelectricPlant, Punta Negra Dam]
  • A. Arroyito Dam
    Arroyito Dam is a hydroelectric and flood-control dam located on Argentina’s Limay River in the Patagonia region.
  • B. Pehuenche Dam
    Pehuenche Dam is a hydroelectric dam on the upper Bío Bío River in Chile, forming part of a cascade of power-generating reservoirs in the Andean foothills.
  • C. Quebrada de Ullum Dam chosen
    Quebrada de Ullum Dam is a hydroelectric and irrigation dam on the San Juan River in Argentina’s San Juan Province, known for power generation, water regulation, and supporting local agriculture.
  • D. El Chañar Dam
    El Chañar Dam is a hydroelectric and irrigation dam located on the Neuquén River in Argentina’s Neuquén Province.
  • E. Rosana Dam
    Rosana Dam is a hydroelectric dam on the Paranapanema River in Brazil, used for generating electricity as part of the broader Paraná River basin power system.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e8ce54cc8190998418ff1f66ef28 completed April 10, 2026, 12:10 p.m.
NER Named-entity recognition batch_69e5fb8e1f888190a95f60fa29ca3b98 completed April 20, 2026, 10:10 a.m.
Created at: April 10, 2026, 1:29 p.m.