Triple
T19259606
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | CB-Full Certification Scheme |
E481610
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | IECEE scheme |
C16640
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: IECEE scheme Context triple: [CB-Full Certification Scheme, instanceOf, IECEE scheme]
-
A.
IEC Conformity Assessment System
chosen
The IEC Conformity Assessment System is a structured framework of international schemes and procedures used to evaluate and certify that electrical, electronic, and related technologies comply with IEC standards.
-
B.
IEC system for conformity testing and certification
An IEC system for conformity testing and certification is a standardized framework that defines procedures, criteria, and accreditation mechanisms to verify and certify that products, services, or systems comply with relevant IEC international standards.
-
C.
IEC standard
An IEC standard is a globally recognized technical specification developed by the International Electrotechnical Commission to ensure safety, interoperability, and performance of electrical and electronic systems and devices.
-
D.
IEC system
An IEC system is an Interactive Evolutionary Computation framework in which human users iteratively evaluate and select candidate solutions so that an evolutionary algorithm can optimize designs, media, or parameters based on subjective preferences.
-
E.
conformity assessment scheme
A conformity assessment scheme is a structured, predefined set of rules, procedures, and criteria used to systematically evaluate and determine whether products, services, systems, or persons meet specified standards or regulatory requirements.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8e8cd9d1081908a181d02b88b59b8 |
completed | April 10, 2026, 12:10 p.m. |
Created at: April 10, 2026, 1:28 p.m.