Triple

T192489
Position Surface form Disambiguated ID Type / Status
Subject LHCb E3749 entity
Predicate upgradePhase P5345 FINISHED
Object Run 3 upgrade LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Run 3 upgrade | Statement: [LHCb, upgradePhase, Run 3 upgrade]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: upgradePhase
Context triple: [LHCb, upgradePhase, Run 3 upgrade]
  • A. upgradeProgram
    Indicates that one entity improves, enhances, or replaces another entity’s program with a more advanced or updated version.
  • B. plannedUpgrade
    Indicates that an entity has a scheduled or intended improvement or enhancement to be carried out in the future.
  • C. updated
    Indicates that an entity has been modified or brought to a more recent state compared to its previous version or status.
  • D. investmentStage
    Indicates the phase or maturity level a company or project is in with respect to receiving investment or funding.
  • E. majorCapturePhase
    Indicates a significant or primary stage in a capture process where the main act of seizing, acquiring, or taking control occurs.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a2548debd48190ae3a06d6e65b53c6 completed Feb. 28, 2026, 2:35 a.m.
NER Named-entity recognition batch_69a259669ba08190a5be1d2e10e70b27 completed Feb. 28, 2026, 2:56 a.m.
PD Predicate disambiguation batch_69a2567567508190b3a41329a15c7156 completed Feb. 28, 2026, 2:44 a.m.
PDg Predicate description generation batch_69a25710bdfc81909b6697159104cf53 completed Feb. 28, 2026, 2:46 a.m.
Created at: Feb. 28, 2026, 2:41 a.m.